2 X NEW HOME PROJECT OAK GVE

This project involves demolishing the existing home and building 2 new homes in its place, each with 3 levels, large living areas, theatre room, cellar, lift, outdoor entertaining area and swimming pool. The designers have made maximum use of the available land area by using basement living areas with courtyards to provide natural air flow and lighting.

 

Start of the build with demolition and soil testing.

Next the swimming pools are installed as they are at the rear of the property and the basement takes the whole front and sides.

Preparation begins for the basement with the piling installed around the perimeter of the building.

The capping beam is installed over the top of the piling tying it all together and providing the foundation for the upper two levels.

Basement dug, with over 2000m3 of soil removed in 3 days.

Wall drainage and shotcrete prepared and completed in the most rain we have had all year. 

Getting ready for basement plumbing and concrete slab works

Basement block work completed ready for structural steel works.

Framing Finished ready to start lockup.