LUXURY HOME BOLTON AVE

This project involves demolishing the existing home and building a new luxurious family home with multiple living and entertaining areas above and below ground, lift, basement parking, swimming pool with a spa. The clients have engaged an Architect and Interior designer to fully detail their vision for a modern and entertaining home.

Demolition begins

Setup and piling completed

Capping Beam preparation before excavation

Basement and Pool dig.

Shotcrete walls and basement plumbing stage. Plumbing works in the basement include a sewer pump station, stormwater pump and stormwater retention system for those days when too much rain keeps falling and the street and council stormwater systems can't keep up with the flow of water.

More basement concrete works with walls formed and poured onsite.

Basement ground slab completed

Suspended slab, hydronic heating, electrical and plumbing penetrations completed.

Last bits of the concrete slab and pool complete ready for setout and structural framing.

Framing Begins.

The finishing touches begin.